The tunnel module is designed to check the clearances for the final tunnel
alignment.
Calculates over break and under break volumes, along with a range of
setting out options for laser guidance and tunnel floor intersection points.
•
Generate shapes which can be hung from an alignment (tunnel
design profile or a trains kinematic envelope)
•
Compare two alignments (tunnel design and laser) to determine
offsets and height differences at required chainages
•
Compare the as-built tunnel position compared the tunnel design
alignment and redesign the alignment if required to put it back on
track
•
Perform a tunnel wriggle to highlight over/under break volumes,
clearances and pinch points
•
Print reports showing maximum and minimum clearances together
with over/under break and pinch points
•
Monitor as-built tunnel sections
•
Print monitoring reports showing movement over time